Port Terminal Maintenance and Repairs - Reserve, La.
CLIENT
Cargill, Inc.
Ibberson provided engineering and construction services to replace two slew bearings on PECO ship loaders.
Ibberson performed structural modifications to the PECO ship loaders to allow the jacking of the towers from the gantry frames. This modification also allowed access for the removal and installation of the bearings. Additional work performed included the removal, installation and torqueing of bolts with load-indicating washers.