Feed Mill Facility - San Pedro Sula, Honduras
CLIENT
Alcon-Cargill Hondouras
Ibberson provided engineering, jacking equipment and on-site technical services for this new feed manufacturing tower that was built using slipform concrete construction technology.
This feed manufacturing tower produces mash and pelleted animal feed, plus mash that is transferred to an existing extrusion facility for the manufacturing of fish feed.
The 212-foot-high slipform concrete tower was slipped in 14 days. Ibberson technicians worked with local contractors to build and assemble the slipform to meet world standards. Technicians were on site for the entire slipform operations.